Sınırsız Enerji

  • Establishment: 2010
  • Area of Activity: Hydroelectric Projects

Güzeloluk Hydroelectric Power Plant, which is the first energy investment of the Group, was established by IDOL Elektrik Üretim A.Ş. a subsidiary of Sınırsız Enerji A.Ş. which is one of Coşkunöz Holding’s energy companies in Gümüşhane province, in the district of Torul. The construction of the project, which has an installed capacity of 14 MW, commenced in 2011 and it went into commercial operation in September 2013. Güzeloluk HES operates with a production capacity to meet the energy needs of approximately 10.000 housings per year.